Implementation of Construction Management Approach for Improving the Productivity of RMC Plants

Authors

  • Deshmukh Niranjan Mahadeo PG Student, SPPU, RMD Sinhgad College Warje, Pune, Maharashtra
  • Prof. R. D. Shinde Professor, Department of Civil Engineering, M.E.(Construction & Management) SPPU, RMD Sinhgad College Warje, Pune, Maharashtra
  • Prof. (Mrs). S. R. Awad Co-Guide, Department of Civil Engineering, M.E.(Construction & Management) SPPU, RMD Sinhgad College Warje, Pune, Maharashtra

DOI:

https://doi.org/10.29070/9b1hc079

Keywords:

RMC Plant, Critical factor, Productivity

Abstract

Our has been traditionally labor oriented. The pace of mechanization in the past has been very slow due to the availability of cheap labor in abundance, lack of capital investment and the highly fragmented nature of the construction industry. The degree of mechanization is still around 25%-30% while it is well above 70% in most of the developed countries The liberalization of Indian economy from 1991 onwards paved the way for large scale investments in infrastructure, industrial, housing and agriculture sectors. The new age constructions required speed and superior quality to obtain profitable life cycle cost of the projects. The emerging scenario helped to increase the pace of mechanization and facilitated the establishment of RMC plants on commercial scale to synchronies with the overall development strategy. RMC in India on commercial scale started in 1993 at Pune with only one plant. It has achieved nearly 15% share of the total concrete produced in the country. In some major cities, like Bangalore, Hyderabad, Mumbai and Chennai the share of RMC has reached as high as 50% to 60%. The growth prospects of RMC in India are enormous, provided requisite support is provided by the regulatory authorities, consumers and decision makers during its formative years. In this project the critical factor causing improving productivity will indentify.

References

“Ready Mix Concrete: Challenges & Opportunities in India”, Dr. S. K. Dave, Shri N. K. Pandya, Shri B. V. Modi, International Journal of Advanced Research In Engineering ,Science And Management, ISSN : 2394-1766, Vol-11 Issue 12,Page No:01-08

“Present technology of ready-mixed concrete and future prospects” M. Takeyama, Muguzine qf Concrete Research, September 1996 Page No: 199-209

“Analysis of Sludge Formed in R.M.C Plant” By Arjita Biswas and P.R Adavi, AKGEC International Journal of Technology, Vol. 2,Issue No:12,Page No:60-65.

“Failure Mode Effect Analysis (FMEA) Risk Management Technique For Quality Control of RMC Production”, Prof.Jyoti Trivedi, Dr.Chakradhar Iyunni, International Journal of Advance Engineering and Research Development (IJAERD) e-ISSN: 2348 - 4470 , print-ISSN:2348-6406.

“A Brief Study of Ready-Mix Concrete: Features & Uses in Construction on the Context of Bangladesh”, Md. Nazmul Haq, Md. Saidur Rahman Chowdhury , Hunain Mahmud , IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 3 (Sep. - Oct. 2013), Page No: 55-57.

“Quantization of risks involved in supply of ready mix concrete in Construction industry in indian scenario”,By Mohd Amir Khan, Shumank Deep, Mohd Asim, Zishan Raza Khan, International Journal of Civil Engineering and Technology, Volume 8, Issue 3, March 2017, Page No:175–184.

“A study on customer preferences and perceptions on quality and services of ready mixed concrete as a sustainable building material in Bangalore city, Karnataka”, By L R Manjunatha, Sandya R Anvekar, S Savitha Sagari, Archana Kumarswamy , International Journal of Research in Engineering and Technology, Volume: 03 Special Issue: 06 , May-2014 Page No:07-14

“Time Management in RMC Plant” By Prof. S.S. Deshmukh and Yogiraj Lohokare, International Journal for Scientific Research & Development ,Vol. 5, Issue 07, 2017,Page No:267-270.

“Qualitative Analysis of Internal And External Risks For Ready Mix Concrete Plants – A Case Study Approach”, By R. C. Walke, Prof. V.M. Topkar, IOSR Journal of Engineering May. 2012, Vol. 2 Issue No: 5 Page No: 1013-1019.

Downloads

Published

2024-09-03

How to Cite

[1]
“Implementation of Construction Management Approach for Improving the Productivity of RMC Plants”, JASRAE, vol. 21, no. 3, pp. 93–98, Sep. 2024, doi: 10.29070/9b1hc079.

How to Cite

[1]
“Implementation of Construction Management Approach for Improving the Productivity of RMC Plants”, JASRAE, vol. 21, no. 3, pp. 93–98, Sep. 2024, doi: 10.29070/9b1hc079.