1.
The optimization of fuzzy integrated models with stochastic demand and a lead time that can be controlled. JASRAE [Internet]. 2024 Oct. 1 [cited 2025 Aug. 1];21(7):410-8. Available from: https://ignited.in/index.php/jasrae/article/view/15697