Analysis of causes of Wastages of Construction Materials on Building Construction Site

Identifying causes and solutions for wastage of construction materials in the Indian construction industry

by Mr. Sanket S. Gawari*, Prof. U. J. Phatak,

- Published in Journal of Advances and Scholarly Researches in Allied Education, E-ISSN: 2230-7540

Volume 15, Issue No. 2, Apr 2018, Pages 527 - 531 (5)

Published by: Ignited Minds Journals


ABSTRACT

Construction industry has been swiftly developing around the world from last three decade especially in India the rate of developing of this industry is very high. There is a lot of capital investment, is invested in this sector as well as this industry become second largest industry after agriculture in India in perspective of capital investment as well as employment generation. This industry directly related with GDP of nation. The bigger construction projects have been launched in power, infrastructure, building sector in recent year. The 60 to 70 expenditure of the any construction project spend on construction materials and it is found that huge quantity of wastage of material take place on site during the construction phase. Wastages of material has major problem in construction industry which must be recognize very efficiently. Effective control on wastages of material saves money, so that organizations profit margin will increase. More specifically, it has main impact on construction cost, construction productivity, time, environment aspect. At such circumstance reduction of wastage of material during the construction phase contribute major role in economy of that construction project. Impact on environment is also serious issue because due to wastages of material the natural resources which are used for production of that construction material also wasted. The majority of this wastage of material can be avoided by competent firm control over supervision of site, flow of construction material strict labour supervision. This paper identifies sources for wastages of construction material and critical factor causing wastages of material for those sources by using Delphi techniques and detailed questionnaires analysis.

KEYWORD

construction industry, capital investment, employment generation, GDP, construction materials, wastages, construction cost, construction productivity, environment, natural resources

I. INTRODUCTION

The Indian construction sector is a fundamental part of the nation and is developing for due to industrialization; the construction industry has been growing at 10-11% year on year, mainly due to the increased home and international manufacturing activities and industrial development. There have also been increased levels of investment - especially by the Government - in infrastructure and real estate projects. The Planning Commission in its Twelfth Five Year Plan Document (2012-17) expects investments in infrastructure projects to be worth US$ 1 trillion over the five years of the Plan. Total investment as a percentage of GDP is expected to be in the range of 7-9 percent. Industrial and infrastructure sectors, together account for majority of construction sector opportunities in India.

Fig 1 (Distribution of Capital in 12th five year

plan) Source: Planning commission of India

The construction sector employs approximately 31 million people, accounts for some 6-8% of GDP and, after agriculture, is the largest employment sector in

Fig 2: Overall Manpower Required In Construction

Industry (Source: Indian HRD Ministry)

A. Building Construction Materials:

Building construction is composed of different types of materials. These materials are either called building materials or materials of construction. It is very vital for a builder may be an architecture or engineer or contractor, to become familiar thoroughly with these building materials. The knowledge of different types of materials their properties and uses for different purposes provide and important tool in the hands of the builders in achieving economy in material cost. The material cost in a building ranges 60 to 70 percent cost of the total cost construction. Reduction of wastage to material achives economy, the correct use of material results in better structural strength, functional efficiency and aesthetic appearance.

Table 1: Percentage Cost Distribution in Construction Industry (TIFAC 2013)

B. Wastage of Construction Materials:

Construction waste can be defined as any materials by product of human and industrial activity that has no residual value. Waste is a product or material that is unwanted.ts Wastage of construction material directly affects on economy and developing rate of project .It is very important to find out the source of generation of wastage of material. During the use of material in construction and demolition of buildings lot of construction waste generated specifically India

II. PROBLEM STATEMENT

The 60 to 70% expenditure of the any construction project spend on construction materials. And it is found that huge quantity of wastage of material take place on site during the construction phase. Wastages of material has major problem in construction industry which must be recognize very efficiently. It is very important to find the sources of wastages of material during construction phase of building .and also to analysis the critical factor of these sources.

III. METHODOLOGY

As the Pune City is most developing city in housing construction sector .There are number of bigger construction projects are run around the Pune city .By keeping this view these projects are consider for this research study. The building .By using Delphi techniques and detailed questionnaires analysis this study carried out. The interviews are taken the personalities which are related to construction sector like General Manager ,Project Managers ,Senior Engineers , Building material suppliers, Labour Contractors, Equipment operators, Government officers, Quality Engineers, Material manager, Store keeper etc. The detailed questionnaires are circulated on various building construction site, total 124 numbers of questionnaires are circulated out of that 90 are returned.

Table 3: Details of Responders

Mr. Sanket S. Gawari1* Prof. U. J. Phatak2

A. Type of Wastages of Materials

From the interviews and questionnaires survey the sources of Wastages of Construction materials are categorized as follows.

Table 4: Type of Wastages of Materials

(i) Direct Wastages: Direct wastages of construction materials are those materials which are waste in actual process of construction.

Fig 4. Wastages of Concrete Fig 5. Wastages of Steel

construction materials are those materials which are waste due to store handling and other factors.

Fig 6. Wastages due to Improper Storage B. Sources of Wastages of Construction Materials. 1. Planning –

In this Source following Factors are considered o Frequent design changes o Design errors o Lack of design information o Poor design quality o Slow drawing distribution o Incomplete contract o Complicated design o Inexperienced designer o Last minute client requirement o Interaction between various specialists o Poor coordination of parties during design stage Remedies: The wastage which occurs in Design stage due to above reasons can be reduce by proper communication and circulation, distribution of designs. Poor coordination in between personnel at site mistakes occurs in implementation of design to avoid this communication in between then should be proper. Complications occurring in the design should be clarified through the experienced designer so that

all details are stated clearly.

2. Lifting & Handling- In this Source following Factors are considered

o Wrong material storage o Poor material handling o Poor quality of materials o Equipment failure o Delay during delivery o Material supplied in loose form o Inefficient methods of unloading o Unsuitable tools are used Remedies: Proper material storage is important to reduce wastage of material as if it is not done then materials get damaged which we cannot use in further construction activities. Materials stored in loose form generally get waste in more quantity to reduce that their storage should be done in such a way that it will get minimized. Delivery of right materials should be at right time with good quality so that construction activity will be followed smoothly if not then unnecessarily material wastage occurs. Tools used for handling material should be proper so that waste will be reduced.

3. Labours-

In this Source following Factors are considered o Worker‘s mistakes during construction o Insufficient training for workers o Lack of experience o Shortage of skilled workers o Lack of awareness among workers o Poor workmanship Remedies: Worker should be well trained to reduce the wastage of material and time also. To avoid wastage because of workers proper distribution of workers as per different activities going on construction site should be done with providing proper training of work which they are going to do. o Scarcity of equipment o Poor information quality o Inappropriate construction methods o Poor supervision o Poor site management o Poor controlling o Poor planning o Rework o Lack of knowledge about construction o Non availability of equipment o Outdated equipment o Communication problems o Lack of waste management Remedies: Poor management of various things on construction site causes major waste on site. To reduce wastage planning, controlling, supervision of various activities going on site should be done effectively. Effective communication plays important role in management to reduce wastage on construction site.

5. Purchase-

In this Source following Factors are considered o Wrong material delivery o Ordering errors o Waiting for replacement o Frequent variation orders o Supplier errors Remedies: Procurement means acquisition of materials as per required standard, quality and quantity at right time. To reduce wastage due to procurement errors proper communication with supplier is required. While ordering any material verification of required quantity, quality and standard should be done before ordering it to supplier.

Mr. Sanket S. Gawari1* Prof. U. J. Phatak2

o Unforeseen ground conditions o Leftover materials on site o Lighting problem o Difficulties accessing construction site o Poor site condition o Congestion of site

7. External factor-

o Effect of weather o Accidents o impulsive local conditions

V. CONCLUSION

Construction sector rapidly developing around the India, especially in building sector huge amount of capital investment and maximum share of this capital spend on materials which are used for construction .But there is lack of effective management and awareness about the wastages of materials during construction phase of project. This causes the wastages of money and delay of construction project. And also this wastages of material adversely affects on environment .Finding out the sources of wastages and their critical factors really challenging work for engineers but that significantly control on the wastages of material .As well as this accumulate the money ,time and saves natural resource which is used for manufacturing of construction material .

VI. REFERENCES

Agus Nugroho, Tanit Tongthong & Takana Shin-ei, ―International Journal of Civil & Environmental Engineering IJCEE- IJENS‖, Vol.13, No:02 Angal vaishali, Nagarkar Geeta, Amurkar Kanchan & Patel Anisha, (2012), Role of infrastructure for sustainable development, ―Construction and Demolition Waste Management‖, Paper No. A18 Angal vaishali, Nagarkar Geeta, Amurkar Kanchan & Patel Anisha, (2012), Role of infrastructure for sustainable development, ―Construction and Demolition Waste Management‖, Paper No. A18 Journal of Engineering & Applied Science‖, Vol.5, No.1, Mansi Jain, (2012) ―International Journal of Scientific & Research Publication‖, Vol.2, Issue 10, ISSN 2250-3153 Nitish Bagdi, Vipin Aggarwal & Neetu Sherwal, (2013) ―Global Journal of Management & Business Studies, ISSN 2248-9878, Vol.3, No.4, Page No. 361-364 ohamad Reza Parsanejad, Mansor Momi ni, Ali Mohaghar, (2011) ― Impact of source on waste production in activities across supply chain: A new approach‖, Nature & science,9 (1) P.Lenin, L.Krishnaraj, D.Narendra Prasad, V.R.Prasath Kumar, (2014) ―International Journal for Research In Applied Science and Engineering Technology‖, Vol.2, Issue 5, May 2014 Sasitharan Nagapan (2012) ―International Journal of Advances in Applied Sciences (IJAAS)‖, Vol.1, No.1, Page No. 1-10 Sasitharan Nagapan, Ismail Abdul Rahman, Ade Asmi, Attab Hameed Memon, Rosli Mohammad Zin (2012) ―International Journal of Integrated Engg.‖, Vol.4, No.2, Page No. 22-28

Corresponding Author Mr. Sanket S. Gawari*

PG Student JSPM‘s ICOER Wagholi, Pune