Study of Delay Analysis in Residential Building Project Fuzzy Approach Questionnaire Survey

A comprehensive study on analyzing and mitigating delays in residential building projects using a fuzzy approach and questionnaire survey

Authors

  • Mr. Sourabh Mukate
  • Prof. U. J. Phatak

Keywords:

delay analysis, residential building project, fuzzy approach, questionnaire survey, construction delays, risk assessment, delay cost, project management, resource allocation, survey analysis

Abstract

Due to the existing risks and growing difficulties of modern construction projects, industrial delays and overspending have become commonplace. Researchers and physicians have used a number of methods to assess the cost of project delays and fear of delays between participating organizations. Basic delay analysis is considered to be one of the most reliable methods of analyzing construction delays. In addition to its benefits, survey analysis can yield different results depending on the amount of data collected, which can be considered as employer and contractor development, as well as the impact of multiple infrastructure upgrades resulting from changes in real-time and working relationships. , And the impact of development events on resource allocation can be considered and delayed as a result. This study raises the basis for an experimental basis for analytical models that can look at a number of factors affecting construction delays. In this work we have developed a basic waiting system and recommendations, which can look at many of the items included in the interview. Finally, the program recommends a variety of common factors that cause delays in the graph. Integrated research applies to any type of construction project.

Downloads

Published

2019-06-01

How to Cite

[1]
“Study of Delay Analysis in Residential Building Project Fuzzy Approach Questionnaire Survey: A comprehensive study on analyzing and mitigating delays in residential building projects using a fuzzy approach and questionnaire survey”, JASRAE, vol. 16, no. 9, pp. 850–854, Jun. 2019, Accessed: Sep. 20, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/12313

How to Cite

[1]
“Study of Delay Analysis in Residential Building Project Fuzzy Approach Questionnaire Survey: A comprehensive study on analyzing and mitigating delays in residential building projects using a fuzzy approach and questionnaire survey”, JASRAE, vol. 16, no. 9, pp. 850–854, Jun. 2019, Accessed: Sep. 20, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/12313