Assessment of Resource Management by Using Primavera Software

Authors

  • Mr. Pritam Pradip Rokade PG Student (Construction Management) Department of Civil Engineering, PVPIT Bavdhan (Kh)
  • Prof. N. N. Morey Assistant Professor, Dept. of Civil Engineering PVPIT Bavdhan (Kh)

Keywords:

Resource Management, Primavera Software, Construction

Abstract

Resource planning and management assists in the future and the use of the board using PRIMAVERA provides greater control, monitoring and a clear calendar of purpose. Asset Management minimizes business losses that may result in the largest types of asset operations. The asset board is a major problem that needs to be addressed in order to maintain the artistic distance from the delay of the promise. The Asset Board enables the organization to use the most available assets. The idea behind asset management is to reduce the cost of disposal of assets in construction for example standing below the share of assets. According to the actual management agreement, the penalty is fixed when the work ends after its due date. A few jobs pass a higher fine than others. At this business center it can make the transition between job pay and can create a time-consuming and time-consuming process for managers to distribute assets, fulfilling client skills. A business manager consistently and consistently wishes to fulfill the interests of his or her partners in terms of cost, quality and time.

References

Deeptisahu, A. K. Jain (2007). ‘Resource planning of a colony project primavera’, Vol. 6 using, Issue.

S.K. Nagarjun and B. Shivakonda Reddy (2012). Resource management in construction project’, vol. 2, Issue.

A. Kastor, K. Sirakolis (2008). ‘The effectiveness of Resource leveling tools for resource constraint project scheduling problem ’, Issue.

Hamed Zaidostan , mohammad Mahigholipoor (2013) ‘using primavera software in resource allocation and project of construction project’, Vol. 4, Issue.

S. K. Nagaraju, B. Sivakonda Reddy (2014). ‘Resource Management in Construction Projects – a case study’. Vol. 4, Issue.

Hong-Hai Tran, Nhat Hoang (2014). ‘Anovel Resource leveling approach for construction projectbased on different evalution’.

Hitanshu Saini, Khushpreet Singh, Uma Malik (2017). Project management in construction using primavera’ issue.

Akshay R. Kohli (2017) enterprise project management using primavera’ vol 4 ,issue 2017

Vijya Bhosale, Prof. Dr. S. S. Shastri (2017). A review of genetic algorithm used for optimizing scheduling of resource constraint construction projects

Nikhil R. Mahajan, Vaishali Joshi (2017). ‘Resource scheduling in construction project using MSP’ Vol. 6, Issue.

Piyush Pramod Bagade and Prof Abhijit Bhirud (2018). Review construction project management software primavera’ Vol. 4.

Suvarana, Yateen Lokesh, Dr. S. P. Mahendra (2017). ‘Planning, Scheduling and tracking of ongoing bridge constructon project using Primavera software’ issue 2017

Atilla Damci (2013). Multiresource leveling in line of balance scheduling’ Vol. 139, Issue.

Aftab Hameed Memom, Rosil Mohammad Zin (2010). ‘Resource driven scheduling implementation in Malaysian construction industry’ Vol. 1, Issue.

Satinder Chopra, Arvind Dewangan (2014). Developing an Efficient Schedule in Primavera P6: Significance of Activity ID & Descriptions, International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 3, Issue 7.

V.dhanalakshmi (2016) High cost infrastructure report monitoring by p6 software, international conference on engineering innovations and solutions (ICEIS – 2016)

P. Esakki Thangam, R. Magdalene Benila (2016) Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6 Software IJSTE - International Journal of Science Technology & Engineering | Volume 2 | Issue 11 | May 2016

Unmesh. Y. Polekar, Rohit. R. Salgude (2015). Planning, Scheduling and Tracking of a residential Project using Primavera Software, International Journal of Advance Research in Computer Science and Management Studies, Volume 3, Issue 5, May 2015

T. Subramani, A. Sarkunam, J. Jayalakshmi (2014). Planning and Scheduling of High Rise Building Using Primavera, T. Subramani et al Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 4, Issue 6 (Version 5), June 2014, pp. 134-144

Vishal Annappa Nimbal, Prof. Balasaheb Jamadar (2017). Planning, Scheduling and Allocation of Resources for multi-storied Structure using Oracle’s Primavera p6 software, International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 |

Downloads

Published

2019-06-01

How to Cite

[1]
“Assessment of Resource Management by Using Primavera Software”, JASRAE, vol. 16, no. 9, pp. 830–834, Jun. 2019, Accessed: Sep. 20, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/14958

How to Cite

[1]
“Assessment of Resource Management by Using Primavera Software”, JASRAE, vol. 16, no. 9, pp. 830–834, Jun. 2019, Accessed: Sep. 20, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/14958