An Analogy Based System to Track Material Management on Site

Optimizing Material Management in Urban Construction Sites

Authors

  • Mrs. Anjali Jadhav
  • Nitin Morey

Keywords:

analogy based system, material management, site, construction industry, space management, site plans, material deliveries, staging areas, crane locations, construction job sites

Abstract

The most commonly used method for space management in the construction industry is the development of site plans. While these plans outline how to manage material deliveries, staging areas and crane locations for construction job sites in suburban areas, they are inadequate for those in congested, urban areas. This study focuses on the floor-level construction material layout which is required for multiple-floor building where multiple construction works occur simultaneously in close proximity. By minimizing excessive re-positioning of construction materials, the floor-level construction material layout would assist in finding sufficient space for construction materials in urban areas where space is limited around the building sites.

Downloads

Published

2018-04-27

How to Cite

[1]
“An Analogy Based System to Track Material Management on Site: Optimizing Material Management in Urban Construction Sites”, JASRAE, vol. 15, no. 2, pp. 287–292, Apr. 2018, Accessed: Sep. 19, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/7932

How to Cite

[1]
“An Analogy Based System to Track Material Management on Site: Optimizing Material Management in Urban Construction Sites”, JASRAE, vol. 15, no. 2, pp. 287–292, Apr. 2018, Accessed: Sep. 19, 2024. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/7932