EPS, OBS, Project Activities for Pune Metro Phase-1 in Primavera P6

Leveraging Primavera P6 for Effective Planning of Pune Metro Phase-1 Bridge Work

Authors

  • Mohammad Afzal S. Siddiqui Author
  • Abhijit N. Bhirud Author

Keywords:

EPS, OBS, project activities, Pune Metro Phase-1, Primavera P6, scheduling, construction projects, metro rail bridge work, enterprise project structure, organizational breakdown structure

Abstract

Primavera is crucial tool for major construction projects where scheduling is required. This paper lists the activities of Pune metro rail bridge work for a 10km stretch of bridge work and highlights the enterprise project structure, organizational breakdown structure, the work breakdown structure and its activities and thus highlight the impact of Primavera P6 in the planning of projects of greater magnitude.

Downloads

Download data is not yet available.

Downloads

Published

2018-04-27

How to Cite

[1]
“EPS, OBS, Project Activities for Pune Metro Phase-1 in Primavera P6: Leveraging Primavera P6 for Effective Planning of Pune Metro Phase-1 Bridge Work”, JASRAE, vol. 15, no. 2, pp. 598–601, Apr. 2018, Accessed: Jan. 12, 2026. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/7997