To Calculate the Alternate Formula for Production Rate When the When the Degree of Imbalance (D) in A Un-Paced Production Line
Developing an Alternate Formula for Calculating Production Rate in Un-Paced Assembly Lines
Keywords:
alternate formula, production rate, degree of imbalance, un-paced production line, assembly line, work station, standard deviation, correction factor, higher work stationAbstract
This study develop the formula for the production rate when the work station is more than 5-station in assembly line production line From Alternate formula production rate are Known and standard deviation of Correction factor (error from the actual production rate “R” to the to the alternate formula production Rate “AFR” are known From 5- work station) are known. This formula is near about correct to calculate the higher (more than 5- work station) work station in production lineassembly line for calculating the production rate in un-paced production line.Downloads
Download data is not yet available.
Published
2019-01-01
Issue
Section
Articles
How to Cite
[1]
“To Calculate the Alternate Formula for Production Rate When the When the Degree of Imbalance (D) in A Un-Paced Production Line: Developing an Alternate Formula for Calculating Production Rate in Un-Paced Assembly Lines”, JASRAE, vol. 16, no. 1, pp. 20–23, Jan. 2019, Accessed: June 12, 2026. [Online]. Available: https://ignited.in/index.php/jasrae/article/view/9435






