A Two Unit Parallel System with Inspection, Repair and Post Repair
Analyzing System Effectiveness in a Two-Unit Parallel System with Inspection and Repair
Keywords:
two-unit parallel system, inspection, repair, post repair, redundant system model, regenerative point technique, system effectiveness, inspection time, type-I repair time, type-II repair timeAbstract
This paper deals with a two-unit active (Parallel) redundant system model with two types of repair Ist and IInd. Whenever a unit fails it requires inspection to decide whether the failed unit needs type I repair or type II repair. Inspection time, type-I repair time, type-II repair time and post repair time distributions are also negative exponential. Various measures of system effectiveness are obtained by using regenerative point technique.Downloads
Download data is not yet available.
Published
2012-05-01
Issue
Section
Articles