An analysis of the risks associated with starting girder operations in high-speed rail projects
DOI:
https://doi.org/10.29070/ge6bam83Keywords:
High-speed rail projects, Girder operations, Risk analysis, Operational risks, Safety management, Financial risks, Risk assessment, Infrastructure constructionAbstract
The study's findings, which take a comprehensive look at risks during girder operation initiation in high-speed rail projects, are particularly relevant for structural integrity, project schedule, project safety, and the project's economics. The study is a mixed methods research that includes qualitative, descriptive statements from experts and cases and quantitative assessment of frequency, severity scales, and impact indicators. Structural & Engineering risks, Operational & logistical, Safety & Environmental and Financial & Project Management risks were systematically identified and categorized. The results indicate that structural risks, including loading estimates and misalignment, have the greatest severity because they can directly affect the integrity of the infrastructure. Safety measures were also born as critical, having to rely on strict adherence with the safety standards, as well as precautions against risks coming from the workers' accident and equipment failure. Operational risks identified included delays, mainly due to equipment unavailability and logistical issues affecting project timelines, which were more frequent. Commissioning risks, including cost overspending and budget mismanagement, were strongly associated with gaps in other risk areas. A comparison and contrast was also conducted, and it was shown that structural and safety risks are paramount in terms of mitigation strategies. The paper highlights the importance of developing an integrated risk management approach that integrates advanced engineering practices, resource planning efficiency, and proactive decision making.
Downloads
References
1. Aven, T. (2016). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1–13.
2. Baecher, G. B., & Christian, J. T. (2005). Reliability and statistics in geotechnical engineering. John Wiley & Sons.
3. Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. Procedia Engineering, 57, 429–433.
4. Chen, C., Ding, X., & Li, Q. (2019). Risk assessment of bridge construction projects using fuzzy logic. Journal of Civil Engineering and Management, 25(3), 215–228.
5. Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19.
6. Ghosh, S., & Jintanapakanont, J. (2004). Identifying and assessing construction project risk in India. Journal of Construction Engineering and Management, 130(2), 153–159.
7. International Union of Railways. (2018). High-speed rail: Fast track to sustainable mobility. UIC Publications.
8. Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley.
9. Li, H., & Love, P. E. D. (1998). Evaluation of risk factors influencing construction delays. International Journal of Project Management, 16(6), 375–381.
10. Liu, J., Zhao, X., & Yan, P. (2020). Risk assessment in high-speed railway construction projects. KSCE Journal of Civil Engineering, 24(5), 1452–1463.
11. PMI. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.
12. Smith, N. J., Merna, T., & Jobling, P. (2014). Managing risk in construction projects (3rd ed.). Wiley-Blackwell.
13. Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction projects. Journal of Construction Engineering and Management, 130(4), 472–481.
14. Zhang, G., Zou, P. X. W., & Kumaraswamy, M. (2013). Risk identification and assessment in infrastructure projects. Engineering, Construction and Architectural Management, 20(6), 626–640.
15. Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects. International Journal of Project Management, 25(6), 601–614.